Our Best Projects
Our Best Projects
Jig Installation
Replacement of Tubular Air heater with total 2.000 tubes as GE subcontractor on PLN 1x 100 MW Ombilin
Economizer Hanger Tube Replacement
PT. Nauli Mitra Strategic Has Successfully Replaced Bowing Economizer Hanger Tube (9000mm) Of POMI U3 1X800MW, Paiton
Tube Replacement FSH
PT. Nauli Mitra Strategic Has Successful Performed Retubing At FSH Due To Tube Leaks Include Retubing LTSH Eroded Tube At Pomi U8 Paiton 2X600MW At 12-19 January 2023
Tube Erosion Shield
PT. Nauli Mitra Strategic Has Successfully Installed Tube Erosion Shield Of POMI U8 1X600MW, Paiton
Our Best Projects
Boiler Retubbing
Successfully Performed Several Boiler Retubbing Project Under GE OI On IP HRSG - Tambak Lorok Plant And Boiler Tube Replacement Under PT. Alstom Power On PT. CPS Cirebon
Tube Replacement
PT. Nauli Mitra Strategic Has Successful To Performed Boiler Tube Replacement On Final Superheater And Final Reheater Of PT. Indocement -Tarjun
Vortex Finder Replacement
PT. Nauli Mitra Strategic As Subcontractor Of Imeco Trans Sarana Has Successfully Performed Replacement Of Vortex Finder On Tarahan Cfb 2 X 100MW
Tube Bending Fabrication
PT. Nauli Mitra Strategic (Which Name Was CV. CST) Has Successfully Performed Tube Bend Fabrication For PT. CPS Cirebon During Emergency Shutdown In 2017