Our Best Projects

Our Best Projects

jig-instalation
Jig Installation
Replacement of Tubular Air heater with total 2.000 tubes as GE subcontractor on PLN 1x 100 MW Ombilin
Economizer-hanger-tube
Economizer Hanger Tube Replacement
PT. Nauli Mitra Strategic Has Successfully Replaced Bowing Economizer Hanger Tube (9000mm) Of POMI U3 1X800MW, Paiton
Tube-Replacement-FSH
Tube Replacement FSH
PT. Nauli Mitra Strategic Has Successful Performed Retubing At FSH Due To Tube Leaks Include Retubing LTSH Eroded Tube At Pomi U8 Paiton 2X600MW At 12-19 January 2023
Tube-erosion-shield
Tube Erosion Shield
PT. Nauli Mitra Strategic Has Successfully Installed Tube Erosion Shield Of POMI U8 1X600MW, Paiton

"Keeping Your Systems Running Efficiently"

Contact Us

Our Best Projects

Boiler-Retubbing
Boiler Retubbing
Successfully Performed Several Boiler Retubbing Project Under GE OI On IP HRSG - Tambak Lorok Plant And Boiler Tube Replacement Under PT. Alstom Power On PT. CPS Cirebon
Tube-Replacement
Tube Replacement
PT. Nauli Mitra Strategic Has Successful To Performed Boiler Tube Replacement On Final Superheater And Final Reheater Of PT. Indocement -Tarjun
Vortex-finder-replacement_3
Vortex Finder Replacement
PT. Nauli Mitra Strategic As Subcontractor Of Imeco Trans Sarana Has Successfully Performed Replacement Of Vortex Finder On Tarahan Cfb 2 X 100MW
Tube-Bending-Fabrication
Tube Bending Fabrication
PT. Nauli Mitra Strategic (Which Name Was CV. CST) Has Successfully Performed Tube Bend Fabrication For PT. CPS Cirebon During Emergency Shutdown In 2017
1+
Hours Of Work
1+
Projects Completed
1+
Locations
1+
Satisfied Companies
Scroll to Top